Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

In hydro power plants

A

Initial cost is high and operating cost is low

B

Initial cost as well as operating costs are high

C

Initial cost is low and operating cost is high

D

Initial cost as well as operating cost is low.

Correct Answer

⚙️ TE • Technical Concept & PrincipleElectricalPower Generation
Option A

Initial cost is high and operating cost is low

Quick Summary:

Hydroelectric power plants are characterized by high capital investment due to civil engineering requirements like dams and penstocks, coupled with very low operational and maintenance (O&M) costs. Unlike thermal plants, there is no recurring expenditure on fuel, as water is a free natural resource.

⚙️TETechnical SolutionConcept & Principle
💡 Explanation

Hydroelectric power plants are characterized by high capital investment due to civil engineering requirements like dams and penstocks, coupled with very low operational and maintenance (O&M) costs. Unlike thermal plants, there is no recurring expenditure on fuel, as water is a free natural resource.

🔢 Key Formulas

P=η⋅ρ⋅g⋅Q⋅HP = \eta \cdot \rho \cdot g \cdot Q \cdot HP=η⋅ρ⋅g⋅Q⋅H — Power output equation where PPP is power, η\etaη is efficiency, ρ\rhoρ is density, QQQ is discharge, and HHH is head.

⚙️ Working Principle

The potential energy of water stored in a reservoir is converted into kinetic energy through penstocks. This water strikes the turbine blades, converting mechanical energy into rotational motion, which then drives a synchronous generator to produce electricity.

📌 Key Points
  • ▸

    High initial cost covers dam construction, land acquisition, and heavy mechanical installation.

  • ▸

    Low operating cost is due to the absence of fuel costs and automation.

  • ▸

    Long operational lifespan compared to thermal or nuclear stations.

✅ Advantages
  • ▸

    No fuel consumption cost.

  • ▸

    Quick start-up and synchronization capability.

  • ▸

    Provides long-term environmental and grid stability.

❌ Disadvantages / Limitations
  • ▸

    High initial capital requirement.

  • ▸

    Geographically restricted to locations with sufficient water head.

  • ▸

    Long gestation period for construction.

🛠️ Applications / Uses
  • ▸

    Base load and peak load power generation.

  • ▸

    Grid frequency regulation and pumped storage systems.

📄 Additional Information
  • ▸

    The depreciation cost in hydro plants is spread over a longer period (50-100 years) than thermal plants.

  • ▸

    Option B is incorrect because O&M costs in hydro plants are among the lowest of all power generation types.

  • ▸

    Option C is factually incorrect as site development costs are the highest among standard generation methods.

📊 Diagram / Illustration
ReservoirTurbineHydroelectric Conversion Process
✅

A is correct — Hydro power plants involve high capital expenditure for civil structures but enjoy minimal operational expenses due to free fuel (water).

Core Concepts Used
Click any tag to open in AI Tutor
Capital Expenditure (CAPEX) Operational Expenditure (OPEX) Hydroelectric energy conversion
💡 EXAM TIP

For competitive exams, always remember that hydro plants have the highest fixed costs but lowest running costs, while thermal plants have lower fixed costs but significantly higher variable (fuel) costs.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-2003?
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is