Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

National Load Dispatch Center is run by

A

Power Grid Corporation of India Limited (PGCIL)

B

Power System Operation Corporation Limited (POSOCO)

C

Government of India

D

Government of Delhi

Correct Answer

Concept & PrincipleElectricalPower Generation
Option B

Power System Operation Corporation Limited (POSOCO)

Quick Summary: The National Load Dispatch Center (NLDC) is the apex body mandated to ensure the integrated operation of the Indian power system. It is operated by Power System Operation Corporation Limited (POSOCO), which was recently renamed Grid Controller of India Limited (Grid-India).

💡 Explanation

The National Load Dispatch Center (NLDC) is the apex body mandated to ensure the integrated operation of the Indian power system. It is operated by Power System Operation Corporation Limited (POSOCO), which was recently renamed Grid Controller of India Limited (Grid-India).

🔢 Key Formulas

factual≈fnominal±0.05Hzf_{actual} \approx f_{nominal} \pm 0.05 Hzfactual​≈fnominal​±0.05Hz — Frequency stability target for grid reliability

Pflow=V1V2Xsin⁡(δ1−δ2)P_{flow} = \frac{V_1 V_2}{X} \sin(\delta_1 - \delta_2)Pflow​=XV1​V2​​sin(δ1​−δ2​) — Real power transmission principle controlled by NLDC/RLDC

⚙️ Working Principle

NLDC acts as the central authority for real-time grid control and dispatch of electricity across regional grids. It coordinates with Regional Load Dispatch Centers (RLDCs) to monitor grid parameters like frequency, voltage, and inter-regional power flow to maintain grid stability and reliability. It also oversees the implementation of the Availability Based Tariff (ABT) and manages the scheduling of inter-state transmission of electricity.

📌 Key Points
  • ▸

    NLDC is the apex body for integrated power system operation.

  • ▸

    Previously part of PGCIL, POSOCO was carved out as an independent entity in 2009.

  • ▸

    Renamed to 'Grid Controller of India Limited' in 2022.

  • ▸

    Ensures optimum scheduling and dispatch of electricity.

✅ Advantages
  • ▸

    Ensures grid frequency stability

  • ▸

    Improves regional and national energy security

  • ▸

    Effective management of cross-border power transmission

❌ Disadvantages / Limitations
  • ▸

    Highly complex computational requirements

  • ▸

    Susceptible to cyber-security threats in modern SCADA systems

🛠️ Applications / Uses
  • ▸

    Real-time Load Dispatch

  • ▸

    Grid Management and Control

  • ▸

    Settlement of Energy Accounts

📄 Additional Information
  • ▸

    POSOCO is now officially known as the Grid Controller of India Limited (Grid-India).

  • ▸

    Option A (PGCIL) is incorrect as POSOCO was separated from PGCIL to ensure independence in system operation.

📊 Diagram / Illustration
Power System Hierarchy in IndiaNLDC (Grid-India)RLDC (Regional)SLDC (State)Generating PlantsConsumers/DISCOMs
✅

B is correct — The National Load Dispatch Center is operated by Power System Operation Corporation Limited (now Grid-India).

Core Concepts Used
Click any tag to open in AI Tutor
Load Dispatching Grid Stability Power System Operation
💡 EXAM TIP

Always remember that in the Indian power sector, 'Operation' is separated from 'Transmission' (PGCIL) to maintain neutrality in power dispatch, which is why POSOCO/Grid-India exists.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is

Discussion (0)