Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

Which of this power plant is started first after system black out

A

Thermal

B

Nuclear

C

Hydro

D

All of above

Correct Answer

Concept & PrincipleElectricalPower Generation
Option C

Hydro

Quick Summary: Hydro power plants are utilized as 'black start' units because they can be started independently without requiring an external electrical supply. Unlike thermal or nuclear plants, which require auxiliary power to run boilers, feed pumps, and cooling systems, hydro plants rely on gravity-fed water to rotate turbines.

💡 Explanation

Hydro power plants are utilized as 'black start' units because they can be started independently without requiring an external electrical supply. Unlike thermal or nuclear plants, which require auxiliary power to run boilers, feed pumps, and cooling systems, hydro plants rely on gravity-fed water to rotate turbines.

🔢 Key Formulas

P=ηρgQHP = \eta \rho g Q HP=ηρgQH — Power output equation where PPP is power, η\etaη is efficiency, ρ\rhoρ is density, ggg is gravity, QQQ is flow, and HHH is head.

⚙️ Working Principle

In a black start scenario, the governor system of a hydro turbine uses a small battery-powered actuator to open wicket gates. As water flows through the turbine, it spins the generator, producing voltage to build up the system frequency. Once stable, this 'cranking' power is used to energize transmission lines to restart larger, non-self-starting thermal plants.

📌 Key Points
  • ▸

    Black start capability refers to the ability of a power plant to start without support from the external grid.

  • ▸

    Thermal plants require 'cranking power' for boiler feed pumps, fans, and cooling systems.

  • ▸

    Hydro units possess high inertia and fast-start characteristics suitable for grid restoration.

  • ▸

    Diesel generators or gas turbines can also serve as black-start units in some grid configurations.

✅ Advantages
  • ▸

    Independent startup capability

  • ▸

    Rapid response to grid frequency fluctuations

  • ▸

    Essential for restoring power during total collapse

❌ Disadvantages / Limitations
  • ▸

    Geographically limited to sites with water reservoirs

  • ▸

    High initial infrastructure cost

  • ▸

    Dependent on hydrological availability

🛠️ Applications / Uses
  • ▸

    Grid restoration after major blackout

  • ▸

    Emergency supply for local distribution grids

📄 Additional Information
  • ▸

    A 'Black Start' unit acts as a 'reference' source for the grid during the restoration phase.

  • ▸

    Option A (Thermal) is incorrect because boilers require electricity for startup.

  • ▸

    Option B (Nuclear) is incorrect due to stringent safety regulations and massive auxiliary power requirements.

📊 Diagram / Illustration
Black Start SequenceHydro Plant (Start)Thermal Plant (Sync)
✅

C is correct — Hydro power plants serve as the designated black start source due to their ability to start without an external electrical grid connection.

Core Concepts Used
Click any tag to open in AI Tutor
Black Start Capability Grid Restoration Auxiliary Power Requirements
💡 EXAM TIP

Always remember that 'self-starting' ability is defined by the absence of need for external excitation or motor-driven auxiliaries, which is the defining characteristic of Hydro and some Gas/Diesel plants.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is

Discussion (0)