Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

North regional load dispatch center is situated at

A

New Delhi

B

Panjab

C

Haryana

D

Uttar Pradesh

Correct Answer

Concept & PrincipleElectricalPower Generation
Option A

New Delhi

Quick Summary: The North Regional Load Dispatch Center (NRLDC) is the apex body for the integrated operation of the power system in the Northern Region of India. It is situated in New Delhi and operates under the jurisdiction of the Power System Operation Corporation (POSOCO), now known as Grid Controller of India Limited.

💡 Explanation

The North Regional Load Dispatch Center (NRLDC) is the apex body for the integrated operation of the power system in the Northern Region of India. It is situated in New Delhi and operates under the jurisdiction of the Power System Operation Corporation (POSOCO), now known as Grid Controller of India Limited.

🔢 Key Formulas

f=12πLCf = \frac{1}{2\pi\sqrt{LC}}f=2πLC​1​ — Note: Frequency stability is a primary responsibility of the RLDC

P=VIcos⁡(ϕ)P = V I \cos(\phi)P=VIcos(ϕ) — Note: Real-time monitoring of active power flow across interstate lines

⚙️ Working Principle

The RLDCs perform the function of monitoring, controlling, and coordinating the power system grid operation in real-time. They manage regional grid frequency, monitor interstate power flow, and coordinate with the National Load Dispatch Center (NLDC) to ensure the stability and security of the grid as per the grid code.

📌 Key Points
  • ▸

    NRLDC is the nodal agency for grid management in the Northern Region (covering states like Punjab, Haryana, UP, Rajasthan, etc.).

  • ▸

    It operates under the Ministry of Power, Government of India.

  • ▸

    Responsible for maintaining Grid Frequency between 49.90 Hz and 50.05 Hz.

  • ▸

    Handles the scheduling and dispatch of electricity from central sector generating stations.

✅ Advantages
  • ▸

    Ensures grid security and reliability.

  • ▸

    Facilitates efficient interstate power trading.

  • ▸

    Real-time monitoring prevents grid collapses.

❌ Disadvantages / Limitations
  • ▸

    High complexity due to the massive size of the Northern Grid.

  • ▸

    Susceptible to cyber-attacks requiring robust security infrastructure.

🛠️ Applications / Uses
  • ▸

    Load frequency control.

  • ▸

    Congestion management in transmission lines.

  • ▸

    Scheduling and accounting of power interchanges.

📄 Additional Information
  • ▸

    India is divided into five regional grids: Northern, Southern, Eastern, Western, and North-Eastern.

  • ▸

    Option B, C, and D are part of the Northern Region but their State Load Dispatch Centers (SLDCs) are located within their respective states, not the Regional center.

📊 Diagram / Illustration
Regional Load Dispatch HierarchyNLDC (National)NRLDC (Northern Region - New Delhi)
✅

A is correct — The North Regional Load Dispatch Center (NRLDC) is centrally located in New Delhi.

Core Concepts Used
Click any tag to open in AI Tutor
Grid Management Power System Security Load Dispatching
💡 EXAM TIP

Always distinguish between SLDC (State level) and RLDC (Regional level) in competitive exams; the NRLDC specifically coordinates the entire northern grid.

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is

Discussion (0)

Loading discussion...
PrevNext