Examoogle
ExamsTest SeriesCBATRank CheckPrevious Year PapersPassBook StoreMy BooksAI Tutor
🛒0
अA
Examoogle

India's most trusted platform for competitive exam PDF books. Expert-authored, watermark-protected, instant access.

Exams & Practice
All Exams & SyllabusMock Test SeriesPrevious Year PapersPractice Questions (MCQs)Recruitment Notifications
Quick Links
Examoogle AI TutorExam NewsBook StoreMy BooksLogin / Sign Up
Support
About UsRefund PolicyPrivacy PolicyTerms of UseContact Us
© 2026 Examoogle. India's #1 competitive exam AI tutor.
🔒 SSL Secured📱 UPI Accepted🧾 GST Invoice
Examoogle

Join 60,000+ competitive exam aspirants

or with email
By continuing, you agree to ourTerms of Service&Privacy Policy
Your Cart
Subtotal₹0
Total₹0
Examoogle • User • info@examoogle.com • EE-2024-8821
Chapter 1 of 12 • Page 1 of 248🔒 Protected PDF • Watermarked
Back to Practice Questions
ElectricalPower Generation
PrevNext

Western regional load dispatch center is situated at

A

Gujarat

B

Maharashtra

C

Div Daman

D

Mumbai

Correct Answer

Fact-Based KnowledgeElectricalPower Generation
Option D

Mumbai

Quick Summary: The Western Regional Load Dispatch Center (WRLDC) is the apex body responsible for the integrated operation of the power system in the Western Region of India, which includes states like Maharashtra, Gujarat, and Madhya Pradesh. It is situated at SEEPZ, Andheri (East), Mumbai.

💡 Explanation

The Western Regional Load Dispatch Center (WRLDC) is the apex body responsible for the integrated operation of the power system in the Western Region of India, which includes states like Maharashtra, Gujarat, and Madhya Pradesh. It is situated at SEEPZ, Andheri (East), Mumbai.

🔢 Key Formulas

P=3VLILcos⁡ϕP = \sqrt{3} V_L I_L \cos \phiP=3​VL​IL​cosϕ — represents the real power transmission handled by the grid dispatch protocols.

⚙️ Working Principle

WRLDC operates under the Power System Operation Corporation Ltd (POSOCO), now known as Grid Controller of India Limited. Its primary mechanism involves real-time monitoring of grid frequency, voltage regulation, and scheduling/dispatch of electricity to maintain the security and stability of the regional power grid.

📌 Key Points
  • ▸

    WRLDC functions as the nodal agency for grid management in the western Indian states.

  • ▸

    It operates under the guidelines set by the Central Electricity Regulatory Commission (CERC).

  • ▸

    It ensures the implementation of the Merit Order Dispatch (MOD) to ensure cost-effective electricity supply.

  • ▸

    Real-time grid security is maintained by observing the N−1N-1N−1 contingency criteria.

✅ Advantages
  • ▸

    Ensures grid stability and frequency control.

  • ▸

    Promotes optimal utilization of regional generation resources.

❌ Disadvantages / Limitations
  • ▸

    High complexity in managing multi-state interdependencies.

  • ▸

    Vulnerability to cyber-physical threats in modern digital grid architectures.

🛠️ Applications / Uses
  • ▸

    Load forecasting for the western grid.

  • ▸

    Inter-state power transfer scheduling.

  • ▸

    Energy accounting and settlement systems.

📄 Additional Information
  • ▸

    The Western Region comprises Maharashtra, Gujarat, Madhya Pradesh, Chhattisgarh, Goa, Daman & Diu, and Dadra & Nagar Haveli.

  • ▸

    The headquarters of WRLDC is located specifically at SEEPZ, Andheri (East), Mumbai, Maharashtra.

📊 Diagram / Illustration
Hierarchy of Power DispatchNLDC (National)WRLDC (Western Regional - Mumbai)SLDC (State Level Dispatch Centers)
✅

D is correct — The Western Regional Load Dispatch Center is established in Mumbai, Maharashtra to coordinate regional power operations.

Core Concepts Used
Click any tag to open in AI Tutor
Power System Operation Load Dispatching Grid Stability
💡 EXAM TIP

For competitive exams, remember that RLDCs (Regional Load Dispatch Centers) are located at: Northern (Delhi), Southern (Bengaluru), Western (Mumbai), Eastern (Kolkata), and North-Eastern (Shillong).

Related Questions

ElectricalPower Generation
For rural and remote areas, _________________for generation and distribution is permitted
ElectricalPower Generation
With reference to EC Act-2003,Setting up State Electricity Regulatory Commission (SERC) has been made_________
ElectricalPower Generation
Which of the following generation needs permission from central electricity authority as per Electricity Act-200
ElectricalPower Generation
The captive generation is ________as per Electricity Act-2003
ElectricalPower Generation
As per Electricity Act-2003, The generation of electricity is

Discussion (0)

Loading discussion...
PrevNext