A 50m long steel tape standardised with a pull of 120N was used for measuring baseline length of 1500m. The pull exerted while measuring is 150N. The correction, Cp, due to pull is given by (the area of cross section of the tape = A; YoungтАЩs modulus= E)
Cp =AE(30N)(1500m)тАЛ
Cp =AE(20N)(1100m)тАЛ
Cp =AE(40N)(1200m)тАЛ
Cp =AE(15N)(1400m)тАЛ
Cp =AE(30N)(1500m)тАЛ
The correction for pull (CpтАЛ) is applied when the actual tension applied during measurement differs from the tension at which the tape was standardized. It is calculated using the formula derived from Hooke's Law for elastic deformation of a uniform bar.
IS 1491:1959 (General Surveying Practices)
The correction for pull (CpтАЛ) is applied when the actual tension applied during measurement differs from the tension at which the tape was standardized. It is calculated using the formula derived from Hooke's Law for elastic deformation of a uniform bar.
CpтАЛ=A├ЧE(PтИТP0тАЛ)├ЧLтАЛ тАФ Pull correction formula where P is applied pull, P0тАЛ is standard pull, L is total length, A is cross-section area, and E is Young's Modulus
When a tape is pulled with a force greater than its standard tension, it undergoes elastic elongation. The elongation ╬ФL=A├ЧE(PтИТP0тАЛ)├ЧLтАЛ represents the correction that must be applied to the measured length to determine the true length of the baseline. Since the measured length is greater than the true length due to this excess pull, the correction is subtracted from the measured length.
Pull correction is positive if the applied pull is greater than the standard pull.
The total correction is calculated based on the cumulative measurement of 1500m.
Given P=150N and P0тАЛ=120N, the net tension difference is 150тИТ120=30N.
Total correction CpтАЛ=AE30├Ч1500тАЛ.
Improves accuracy of baseline measurements in geodetic surveying.
Allows for standardized tape usage across varying field conditions.
Requires precise knowledge of the tape's elastic properties (A and E).
If the applied tension is less than the standard tension, the correction becomes negative.
Baseline measurement in triangulation networks.
Precise engineering surveys where tape standardization is critical.
Standard pull (P0тАЛ) is usually determined during factory calibration of the steel tape.
Options B, C, and D are numerically incorrect based on the calculated net tension of 30N and total distance of 1500m.
A is correct тАФ The pull correction is calculated as AE(150тИТ120)├Ч1500тАЛ=AE30├Ч1500тАЛ.
Always verify whether the correction is additive or subtractive; for pull, if P>P0тАЛ, the tape is longer than intended, meaning the recorded measurement is shorter than the actual ground distance.